Stop unplanned downtime with pre-warning of failures
The Engineering Network Ltd
Posted to News on 16th May 2022, 16:52

Stop unplanned downtime with pre-warning of failures

Stop unplanned downtime with pre-warning of failures

Downtime costs money. To help prevent this Igus has the i-cee:plus and you can see for yourself how simple and easy to system is in this video.

The i-cee:plus is an intuitive hardware and software system that not only gives you a lifetime prediction of your energy chains, but also pre-warns you of potential failures before they occur so you can schedule planned downtime to suit you and your business.

igus (UK) Ltd

51A Caswell Road
Brackmills
NN4 7PW
UNITED KINGDOM

+44 (0)1604 677240

The Engineering Network Ltd ABSSAC Ltd Baumer Ltd Phoenix Mecano Ltd AdaptTech Manufacturing Solutions Phoenix Contact UK ETA Enclosures (UK) Ltd Motor Technology Ltd Pepperl+Fuchs GB Ltd WISKA UK Leuze electronic Ltd RLS Merilna tehnika d.o.o. BR Consultants UK IDE Electric S.L
The Engineering Network Ltd