BigHead ramps up production
The Engineering Network Ltd
Posted to News on 5th Feb 2007, 00:00

BigHead ramps up production

The manufacture of BigHead fasteners depends on one core requirement - the ability to weld a thin, large-diameter metal head to a stud or collar, at a strength equal to that of the metal of which it's made. This central skill is at the heart of the BigHead product range, and with the company's latest automatic welding machine now in full production, a major increase in production capacity is on-line, helping to produce the company's range of over 1,200 variants.

BigHead ramps up production

Designed and built by BigHead's technical staff with the help of BWP Technical Services, the Twinhead is capable of producing two sizes of BigHead simultaneously at a production rate of some 3,000 per hour, at zero defect levels.

BigHead Bonding

Unit 1, Black Moor Business Park
36A Black Moor Road
BH31 6BB
UNITED KINGDOM

01202 574601

AutomateUK The Engineering Network Ltd ABSSAC Ltd Acorn Industrial Services Ltd Pepperl+Fuchs GB Ltd Lenze Ltd AdaptTech Manufacturing Solutions
The Engineering Network Ltd